Rochester, New York
Client: Time Warner Cable, Harry Goldberg
Project Type: Mission Critical
Design Budget: $3,000,000
Engineering Services Provided: HVAC, Plumbing/Fire Protection, Electrical
Completed: July, 2008
This project included the design of a new electric service, a 3,200 ampere paralleling switchboard, and capacity for up to (5) 750 kW emergency generators, two sets of two 400 kW paralleled UPS units, and dual path critical power distribution to the existing equipment racks.