Alfred University, Data Center

Alfred, New York

Client: HBT Architects, Trevor Harrison

 

Project Description: The project entailed construction of a new 1,000 square foot central data center for the Campus ITT Group.  The project design included an emergency generator, heating, cooling and humidity controls, protection of the space with an FM-200 system and distribution from a UPS system.

Project Type: Mission Critical

Design Budget: $1,500,000

Engineering Services Provided: HVAC, Plumbing/Fire Protection, Electrical

Completed: August, 2007

Design Challenges…Met

This project included the renovation of an existing space to provide a 1,000 square foot Data Center.  The design included precision air conditioning, humidity controls, an emergency power distribution system, uninterruptible power supplies, an FM-200 fire suppression system, and extension of the Campus fiber network.

  • Email this page to a colleague
  • Sustainable Design Projects
  • Mission Critical Projects
  • Health Care Projects
  • Educational Projects
  • Municipal Projects
  • Commercial Projects
  • Turner Integrated Systems Projects
  • Home

© 2008-2010 Turner Engineering PC | 349 West Commercial Street | Suite 2190 | East Rochester, NY 14445 | 585-381-3360

 

  • HOME
  • CONTACT US
  • SITE MAP